Installing steel beams for the upper floor

We're going up! The ground floor slab has been installed. Dozens of prefab columns and walls have been placed for the ground floor. Now, the steel beams for the first floor are being installed. This task is expected to be completed by the end of October, after which more prefab columns and walls will be placed for the first floor. Onward to the highest point!